Project Details
The south west section of the circulatory carriageway of Charlotte Place was widened with the island adjusted to provide 3 circulatory lanes at East Park Terrace, thus improving the transport corridor and flow of traffic into the Ring Road. The section of carriageway was resurfaced.
Before: